Dj Tech Aluminum Condensing Boiler
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
TRD01 - Boiler Services - Tradesperson Installation Repair and Maintenance Services Aalanco Service Corporation | Daniel Mahr | [email protected] | 5083661449 Boiler Equipment, Inc. | Elizabeth McDonald | [email protected] | 7813443700 Healthy Air Solutions Inc. | Brenda Durgin | [email protected] | 7816594062Get Price
Some typical excess air levels in various types of equipment (at zero or minimum smoke) Type /&_ Home Heat Apartment House Boiler Ship's Boiler 60 MW Power Station Heat Input to Furnace -,168 Btu/hr 0.18 2.2 80 600 Excess Air % 40 27 15 3 C0,% 11 13 14 15.7 L.- Table 3.Get Price
A highly exothermic waste requires a cool- ing medium such as excess air, steam, or water for temperature control. Configuration 2-1.2 is an incinerator fitted with a heat recovery boiler. The boiler, with economizer, can recover approximately 70% of the heat energy supplied to the incinerator by the waste and fuel. 2-11Get Price
TRD01 - Boiler Services - Tradesperson Installation Repair and Maintenance Services Aalanco Service Corporation | Daniel Mahr | [email protected] | 5083661449 Boiler Equipment, Inc. | Elizabeth McDonald | [email protected] | 7813443700 Healthy Air Solutions Inc. | Brenda Durgin | [email protected] | 7816594062Get Price
A highly exothermic waste requires a cool- ing medium such as excess air, steam, or water for temperature control. Configuration 2-1.2 is an incinerator fitted with a heat recovery boiler. The boiler, with economizer, can recover approximately 70% of the heat energy supplied to the incinerator by the waste and fuel. 2-11Get Price
TRD01 - Boiler Services - Tradesperson Installation Repair and Maintenance Services Aalanco Service Corporation | Daniel Mahr | [email protected] | 5083661449 Boiler Equipment, Inc. | Elizabeth McDonald | [email protected] | 7813443700 Healthy Air Solutions Inc. | Brenda Durgin | [email protected] | 7816594062Get Price
Some typical excess air levels in various types of equipment (at zero or minimum smoke) Type /&_ Home Heat Apartment House Boiler Ship's Boiler 60 MW Power Station Heat Input to Furnace -,168 Btu/hr 0.18 2.2 80 600 Excess Air % 40 27 15 3 C0,% 11 13 14 15.7 L.- Table 3.Get Price
A highly exothermic waste requires a cool- ing medium such as excess air, steam, or water for temperature control. Configuration 2-1.2 is an incinerator fitted with a heat recovery boiler. The boiler, with economizer, can recover approximately 70% of the heat energy supplied to the incinerator by the waste and fuel. 2-11Get Price
Some typical excess air levels in various types of equipment (at zero or minimum smoke) Type /&_ Home Heat Apartment House Boiler Ship's Boiler 60 MW Power Station Heat Input to Furnace -,168 Btu/hr 0.18 2.2 80 600 Excess Air % 40 27 15 3 C0,% 11 13 14 15.7 L.- Table 3.Get Price