50 tph biomass power plant

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :50 tph biomass power plant
  • Supply Capacity : 10 units/month :50 tph biomass power plant
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Power plant and calculations: Boiler calculations for

    Feb 12, 2021 · Oil consumption (Mf) = 5.5 TPH. 19-A biomass fired boiler of efficiency 60% operates 285 days in a year, it generates 25 TPH (Q1) steam for a process at pressure 21 kg/cm2 & 360 deg C temperature. Calculate the cost of fuel to operate the boiler. Assume fuel GCV 2500 kcal/kg, feed water temperature 105 deg C & cost of fuel per ton is Rs 2800.Get Price

  • Power plant and calculations

    2.What will happen if steam blowing is not done after erection or repair of Boiler? If steam blowing is not done, considerable damage will happen to the steam lines & other end user applications like steam turbine, process heat exchangers due to scale, debris & other foreign materials present in the newly erected pipe lines/coils.Get Price

  • Power plant and calculations: Boiler calculations for

    Feb 12, 2021 · Oil consumption (Mf) = 5.5 TPH. 19-A biomass fired boiler of efficiency 60% operates 285 days in a year, it generates 25 TPH (Q1) steam for a process at pressure 21 kg/cm2 & 360 deg C temperature. Calculate the cost of fuel to operate the boiler. Assume fuel GCV 2500 kcal/kg, feed water temperature 105 deg C & cost of fuel per ton is Rs 2800.Get Price

  • Sitson India Pvt. Ltd.

    ♦ 90 Boiler Installations up to capacity 150 TPH, pressure 125 Kg/cm2, 540°C temperature. ♦ Power Projects up to 30 MW on various fuels like Bagasse, Coal, Biomass etc. executed on EPC basis including Civil work & Switchyard. ♦ 6 Sugar Mills & Co-generation Projects commissioned on turnkey basis.Get Price

  • Power plant and calculations: Boiler calculations for

    Feb 12, 2021 · Oil consumption (Mf) = 5.5 TPH. 19-A biomass fired boiler of efficiency 60% operates 285 days in a year, it generates 25 TPH (Q1) steam for a process at pressure 21 kg/cm2 & 360 deg C temperature. Calculate the cost of fuel to operate the boiler. Assume fuel GCV 2500 kcal/kg, feed water temperature 105 deg C & cost of fuel per ton is Rs 2800.Get Price

  • LATTC | Academics | Academic Programs

    By fulfilling the program requirements, students will have the necessary skills for entry and mid level jobs in the general maintenance industry. This program prepares the student for basic electrical, heating and refrigeration, plumbing, and carpentry work, and to pass the "Certified Boiler/Steam Plant" License exam.Get Price

  • Power Engineers, Boiler, Pressure Vessel and Refrigeration

    Definitions for the Act. 1 For the purposes of the Act: "boiler" means a vessel in which, by the application of heat, (a) gas, steam or vapour is capable of being generated and pressurized, or (b) a liquid is capable of being pressurized or heated and includes fittings and boiler external piping associated with the vessel; "boiler system" means a power plant, heating plant, low …Get Price

  • Sitson India Pvt. Ltd.

    ♦ 90 Boiler Installations up to capacity 150 TPH, pressure 125 Kg/cm2, 540°C temperature. ♦ Power Projects up to 30 MW on various fuels like Bagasse, Coal, Biomass etc. executed on EPC basis including Civil work & Switchyard. ♦ 6 Sugar Mills & Co-generation Projects commissioned on turnkey basis.Get Price

Discount
7X24 Online