1000 Hp Powerhouse Temporary Electric Heating Hot Water Boiler Seller
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Feb 12, 2021 · Cost of fuel for operating the Boiler for 285 days = 9.65 X 24 X 285 X 2800 =18.16 crore. 20-Calculate the specific fuel consumption of a power plant. If steam Turbine consumes 4.2 Tons of steam to generate 1 MW of power. Assume steam to fuel ratio of Boiler is 4.8.Get Price
The boiler manufacturer should state the maximum total dissolved solids (TDS) in the boiler water at which the required steam purity can be obtained. • The steam as measured at drum outlet should have an impurity not greater than 0.02 mg/kg (ppm mass) silica. The wetness of the steam leaving the drum should not exceed 0.02%. •Get Price