Fire tube 5 ton propane steam boiler Boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :Fire tube 5 ton propane steam boiler Boiler
  • Supply Capacity : 10 units/month :Fire tube 5 ton propane steam boiler Boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • eCFR :: 40 CFR Part 60 Subpart OOOO -- Standards of

    (D) If a boiler or process heater is used as the control device, then you must introduce the vent stream into the flame zone of the boiler or process heater. ( 2 ) Each vapor recovery device ( e.g., carbon adsorption system or condenser) or other non-destructive control device must be designed and operated to reduce the mass content of VOC in Get Price

  • Used Brewhouses

    Heat exchanger Various lengths of brewhouse hose with 1.5" tri clamp fittings, totaling ~150 feet. Many miscellaneous fittings and brewhouse spare parts Ajax HRNG-12 Steam Boiler with condensate return system, various steam traps and fittings for steam installation included Apollo Grain mill plus augerGet Price

  • PTS/PTU Series - Infrared Radiant Gas-Fired Tube Heaters

    As an alternative, the radiant gas tube heaters were chosen. A hot water boiler system was installed to heat other parts of the new sports complex which, in addition to the practice field, includes a two-story structure with full basement for offices, locker rooms, a sauna, steam room, and weight-lifting facility.Get Price

  • Combustion Evaluation: Sources and Control Devices

    Steam consumption for atomizing runs from 1 to 5% of steam produced, usually averaging around 2%. Almost any gas can be used to drive the sound generator - air, steam, oxygen, propane, etc. d. About 1 pound of air will atom- ize 5 pounds of oil. Case history of a 20 gph fire tube hot water boiler As found Reset to specifi- cations draft Get Price

  • MARITIME DICTIONARY – Officer of the Watch

    Apr 29, 2013 · Boiler: Any vessel, container or receptacle that is capable of generating steam by the internal or external application of heat. There are two general classes of boilers. I.E., fire-tube and water-tube. Boiler casing: A wall protecting the different deck spaces from the heat of the boiler room. Boiler chocksGet Price

  • Residential Condensing Units | F.W. Webb Online Ordering

    York YCD60B22S Air Conditioner LX 5 Ton 208/230 Volt 1 Phase R-410A 13 SEER Microchannel . $2,384.00 Navien NFC175 Condensing Boiler Combination Wall Hung Fire Tube Natural Gas or Propane Air Vent 175000/18000 BTU . $3,026.32 / ea Bradford White BMFTCF199NA1XN Condensing Boiler Brute Combi Floor Standing 199000BTU 95% . $3,503.76 Get Price

  • LTU Series - Radiant Infrared Gas-Fired Tube Heaters

    As an alternative, the radiant gas tube heaters were chosen. A hot water boiler system was installed to heat other parts of the new sports complex which, in addition to the practice field, includes a two-story structure with full basement for offices, locker rooms, a sauna, steam room, and weight-lifting facility.Get Price

  • Piping Registration – Pressure Vessel Engineering

    Apr 15, 2011 · 2(b) "boiler" means a vessel in which steam is or may be generated or hot water produced under pressure, and includes any high pressure boiler or low pressure boiler and any pipe, fitting, prime mover, machinery or other equipment attached to the vessel or used in connection with the vessel;Get Price

  • SU Prof Herri | PDF

    Suatu boiler dengan laju alir air umpan masuk 1 ton/jam pada tekanan 20 bar dan temperatur 80oC, dikonversi menjadi kukus dengan temperatur 250oC. Boiler ini memiliki sistem blowdown dengan laju alir 5% dari air umpan boiler pada kondisi saturated water. Hitunglah: a. Energi yang dibutuhkan untuk mengkonversi kukus b.Get Price

  • PTS/PTU Series - Infrared Radiant Gas-Fired Tube Heaters

    As an alternative, the radiant gas tube heaters were chosen. A hot water boiler system was installed to heat other parts of the new sports complex which, in addition to the practice field, includes a two-story structure with full basement for offices, locker rooms, a sauna, steam room, and weight-lifting facility.Get Price

  • HVAC State and Local Licensing Requirements

    Oh yeah, and depending on the kind of work you do you might also need a separate boiler license, oil burner license, steam license, propane license, refrigeration license … You get the point. And if you're going independent, then there are all the considerations for contractor licensing too, and it can be just as mind boggling.Get Price

  • SU Prof Herri | PDF

    Suatu boiler dengan laju alir air umpan masuk 1 ton/jam pada tekanan 20 bar dan temperatur 80oC, dikonversi menjadi kukus dengan temperatur 250oC. Boiler ini memiliki sistem blowdown dengan laju alir 5% dari air umpan boiler pada kondisi saturated water. Hitunglah: a. Energi yang dibutuhkan untuk mengkonversi kukus b.Get Price

  • Used Brewing Systems

    Steam jacketed brewhouse, 535 steam lbs per hour boiler and all the equipment, 3 pass heat exchanger, six 10bbl jacketed fermenters, 2 jacketed 10bbl brite tanks, two head keg filler, two head steam powered keg cleaner, an industrial miller, DM filtration system, full automated CIP machine, 750 lb air compressor, insulated glycol tank and Get Price

  • LTU Series - Radiant Infrared Gas-Fired Tube Heaters

    As an alternative, the radiant gas tube heaters were chosen. A hot water boiler system was installed to heat other parts of the new sports complex which, in addition to the practice field, includes a two-story structure with full basement for offices, locker rooms, a sauna, steam room, and weight-lifting facility.Get Price

  • Residential Condensing Units | F.W. Webb Online Ordering

    York YCD60B22S Air Conditioner LX 5 Ton 208/230 Volt 1 Phase R-410A 13 SEER Microchannel . $2,384.00 Navien NFC175 Condensing Boiler Combination Wall Hung Fire Tube Natural Gas or Propane Air Vent 175000/18000 BTU . $3,026.32 / ea Bradford White BMFTCF199NA1XN Condensing Boiler Brute Combi Floor Standing 199000BTU 95% . $3,503.76 Get Price

Discount
7X24 Online