20tph coal cfb boiler pharmaceutical industry
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Code (ANSI Z223.1-latest edition) or the Natural Gas and Propane Installation Code (CSA B149.1). State of California: The Combi Boiler must be braced, anchored or strapped to avoid moving during an earthquake. Contact local utilities for code requirements in your area or call: 1-866-766-7489 and request instructions. Be sure to do Prohibited Get Price
(1) ASME Boiler and Pressure Vessel Code (ASME Code), 2017 Edition, July 1, 2017 ASME BPVC.VIII.1-2017, Section VIII - Rules for Construction of Pressure Vessels Division 1. (v) Fuel cell technologies - Part 6-100: Micro fuel cell power systems - Safety, Edition 1.0, March 2010, Get Price
Code (ANSI Z223.1-latest edition) or the Natural Gas and Propane Installation Code (CSA B149.1). State of California: The Combi Boiler must be braced, anchored or strapped to avoid moving during an earthquake. Contact local utilities for code requirements in your area or call: 1-866-766-7489 and request instructions. Be sure to do Prohibited Get Price
(1) ASME Boiler and Pressure Vessel Code (ASME Code), 2017 Edition, July 1, 2017 ASME BPVC.VIII.1-2017, Section VIII - Rules for Construction of Pressure Vessels Division 1. (v) Fuel cell technologies - Part 6-100: Micro fuel cell power systems - Safety, Edition 1.0, March 2010, Get Price