compact disc of bagasse boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :compact disc of bagasse boilers
  • Supply Capacity : 10 units/month :compact disc of bagasse boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • eCFR :: 40 CFR Part 63 Subpart JJJJJJ -- National Emission

    For purposes of this subpart, boilers that use a supplemental fuel only for startup, unit shutdown, and transient flame stability purposes still qualify as affected boilers that burn a single type of fuel, and the supplemental fuel is not subject to the fuel analysis requirements under § 63.11213 and Table 5 to this subpart.Get Price

  • eCFR :: 40 CFR Part 63 Subpart JJJJJJ -- National Emission

    For purposes of this subpart, boilers that use a supplemental fuel only for startup, unit shutdown, and transient flame stability purposes still qualify as affected boilers that burn a single type of fuel, and the supplemental fuel is not subject to the fuel analysis requirements under § 63.11213 and Table 5 to this subpart.Get Price

  • eCFR :: 40 CFR Part 63 Subpart JJJJJJ -- National Emission

    For purposes of this subpart, boilers that use a supplemental fuel only for startup, unit shutdown, and transient flame stability purposes still qualify as affected boilers that burn a single type of fuel, and the supplemental fuel is not subject to the fuel analysis requirements under § 63.11213 and Table 5 to this subpart.Get Price

  • ATO Depreciation Rates 2021 • Hot

    Jul 01, 2016 · Hot water systems (excluding commercial boilers and piping) 10 years: 20.00%: 10.00%: 1 Jul 2019: Kitchen assets: Hot food display and warming assets (including bain marie, banquet units, buffet units, hot boxes, plate warmers) 10 years: 20.00%: 10.00%: 1 Jul 2019: OTHER SERVICES: Hairdressing and beauty services: Beauty industry assetsGet Price

  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    Boilers and process heaters in the units designed to burn gas 1 fuels subcategory with a heat input capacity greater than 5 million Btu per hour and less than 10 million Btu per hour must complete a tune-up every 2 years as specified in § 63.7540. Boilers and process heaters in the units designed to burn gas 1 fuels subcategory are not subject Get Price

  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    Boilers and process heaters in the units designed to burn gas 1 fuels subcategory with a heat input capacity greater than 5 million Btu per hour and less than 10 million Btu per hour must complete a tune-up every 2 years as specified in § 63.7540. Boilers and process heaters in the units designed to burn gas 1 fuels subcategory are not subject Get Price

  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    Boilers and process heaters in the units designed to burn gas 1 fuels subcategory with a heat input capacity greater than 5 million Btu per hour and less than 10 million Btu per hour must complete a tune-up every 2 years as specified in § 63.7540. Boilers and process heaters in the units designed to burn gas 1 fuels subcategory are not subject Get Price

  • ATO Depreciation Rates 2021 • Hot

    Jul 01, 2016 · Hot water systems (excluding commercial boilers and piping) 10 years: 20.00%: 10.00%: 1 Jul 2019: Kitchen assets: Hot food display and warming assets (including bain marie, banquet units, buffet units, hot boxes, plate warmers) 10 years: 20.00%: 10.00%: 1 Jul 2019: OTHER SERVICES: Hairdressing and beauty services: Beauty industry assetsGet Price

  • ATO Depreciation Rates 2021 • Hot

    Jul 01, 2016 · Hot water systems (excluding commercial boilers and piping) 10 years: 20.00%: 10.00%: 1 Jul 2019: Kitchen assets: Hot food display and warming assets (including bain marie, banquet units, buffet units, hot boxes, plate warmers) 10 years: 20.00%: 10.00%: 1 Jul 2019: OTHER SERVICES: Hairdressing and beauty services: Beauty industry assetsGet Price

Discount
7X24 Online