Gregtech Large Steam Boiler Lava
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Universal steam boiler CSB. Available in six output sizes, from 300 to 5,200 kg/h for pressures ranging between 0.5 and 16 bar; High efficiency rating of up to 95.3% with integrated economiser and helical heat exchanger tubes; Versatile design for use with different fuel types and as a multi-fuel firing unit (oil, gas, biogas, hydrogen) More Get Price
Steam Solutions The PARAT Electrode Boiler is the world leading solution for High Voltage Electrode Steam Boilers. With steam pressure range of 6 - 85 barg and capacity up to 60 MW, you have the solutions for small and large capacity steam production. This is the perfect boiler to replace your fossil fuel steam boilers with clean electrical heat.Get Price
Superheated Steam: 35 - 100: 100 - 300: Saturated steam - low pressure - is common for heating services and secondary process pipes. Saturated steam - high pressure - is common in powerhouse, boiler and main process lines. Superheated steam is common in power generation and turbine plants. Sponsored Links .Get Price
300: 400: 485: 520: Steam production (kg steam/kg bagasse) 2.50: 2.36: 2.23: 2.18: Boiler efficiency - LHV basis (%) The first stage is to heat up the feed stream by adding steam and H 2 SO 4 for thermal acid hydrolysis. The second stage is to use enzymes for saccharification and SSF. Total installed equipment cost is 164.1, 201.7 and Get Price
Largest mean overload = 10 300 kg/h for 30 minutes every 95 minutes. Pressure = 5 bar g. Required steam storage = 10 300 kg/h - 5 000 kg/h steam supplied by the boiler. Required steam storage = 5 300 kg/h. However, steam is only required for 30 minutes every hour, so the steam storage required must beGet Price
MARINE BOILER 1. Dimension : Boiler body (Excluding insulation) 2. Dry weight : Boiler body (Excluding water) 3. Working pressure : Accroding to requirement 4. Dimension(W) : Steam drum length 5. For other capacities, please contact us Steam Capacity Working pressure Dry weight (ton/hr) (kg/cm2) LW H (ton) PD01 25 16/22 3,960 3,900 6,950 36.8Get Price
The area performance in one working step depends on the capacity of the steam generator (e.g. steam boiler): Steam capacity kg/h: 100 250 300 400 550 800 1000 1350 2000 Area m 2: 15–20 30–50 50–65 60–90 80–120 130–180 180–220 220–270 300–400Get Price
Superheated Steam: 35 - 100: 100 - 300: Saturated steam - low pressure - is common for heating services and secondary process pipes. Saturated steam - high pressure - is common in powerhouse, boiler and main process lines. Superheated steam is common in power generation and turbine plants. Sponsored Links .Get Price
CONVERSION OF BOILER IN KG/H AND KW (Approximate) G.B. and U.S.A. Steam from and at 100°C Boiler HP Kg/h 2.26MJ/kg Metric System Steam from 0°C to 100°C Kg/h 2.26MJ/kg Power In kW 1 5 10 15 20 30 40 50 60 70 80 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 15.65 78 156 235 313 470 626 783 940 1096 1252 1566Get Price
Largest mean overload = 10 300 kg/h for 30 minutes every 95 minutes. Pressure = 5 bar g. Required steam storage = 10 300 kg/h - 5 000 kg/h steam supplied by the boiler. Required steam storage = 5 300 kg/h. However, steam is only required for 30 minutes every hour, so the steam storage required must beGet Price
The area performance in one working step depends on the capacity of the steam generator (e.g. steam boiler): Steam capacity kg/h: 100 250 300 400 550 800 1000 1350 2000 Area m 2: 15–20 30–50 50–65 60–90 80–120 130–180 180–220 220–270 300–400Get Price